YouTube video

After 11 years of construction, and 23 years after the Loma Prieta earthquake took part of it out, the new eastern span of the Bay Bridge is nearly done. Caltrans plans to open the bridge to traffic this September. While we wait for the opening, the Metropolitan Transportation Commission has released a fascinating 2-minute timelapse video of construction since 2009, put together from EarthCam‘s webcam footage. It makes it look so easy.

Related:
Lightning strikes Bay Bridge in midst of dramatic storm [04.13.12]
View from the water: New span of Bay Bridge takes shape [10.05.11]
Sneak peek: Up close on the new Bay Bridge span [02.14.11]

Would you like a digest of the day’s Berkeley news in your inbox at the end of your day? Click here to subscribe to Berkeleyside’s free Daily Briefing.

"*" indicates required fields

See an error that needs correcting? Have a tip, question or suggestion? Drop us a line.
Hidden

Lance Knobel (Berkeleyside co-founder) has been a journalist for nearly 40 years. Much of his career was in business journalism. He was editor-in-chief of both Management Today, the leading business magazine...